top of page

Bitumen WB Bathroom

Under Screed & Tiles

Fleeced®-On Bitumen WB System – Ultimate Under-Tile Waterproofing for Bathrooms

Engineered for superior performance, the Fleeced®-On Bitumen WB System is a water-based modified bitumen waterproofing solution, specially developed for under-tile protection in bathroom wet areas. This complete system ensures a durable, flexible, and seamless barrier against water ingress, safeguarding concrete substrates from long-term damage.

✅ Bitumen WB  – A water-based bitumen coating that keeps water out.

✅ Crystalline Slurry – Seals tiny cracks by forming crystals inside the concrete.

✅ Primer Bond  – Helps the coating stick better to the surface.

✅ Fleece – Adds strength and helps cover cracks.

​​​

🛁 Perfect for bathrooms, toilets, and wet areas before tiling.
🛡️ Strong, flexible, and seamless protection.
🔖 Patent Pending: PI2025003564

Built to last. Easy to apply. Total peace of mind.

buy now
FOB-BUNDLE_Bathroom.png

Build-up

Fleeced-on Bitumen built up

Field of application 

Properties - Advantages

  • Under screed & tiles bathroom floor

  • Small balcony under 100sft

  • Planter box

  • Exceptionally high elasticity and crack-bridging properties

  • Excellent adhesion on various substrates

  • High resistance to ponding water and abrasion

  • Retains its elasticity even in very low temperatures (down to -40°C)

  • Easy to apply (one-component-cures with the ambient humidity

  • High chemical resistance

  • Fast-drying

🛠️ Step-by-Step Installation: Fleeced®-On Bitumen System (Bathroom Under Screed & Tiles Waterproofing)

  • Step 1: Surface Preparation

- Clean the entire bathroom floor to remove dust, dirt, and debris.

- Patch visible holes using non-shrink grout or tile adhesive cement.

- Ensure the surface is smooth and flat.

  • Step 2: Apply Primer

- Apply Primer Bond to the entire floor slab and wall skirting

 (up to 100mm high).

- Let it dry for at least 30 minutes before continuing.

  • Step 3: Pipe Collar Protection (PVC Pipe Area)

- Cut fleece into a square (approx. 30cm x 30cm).

- Double-fold the fleece in half, then diagonally.

- Trim the pointed tip to create a small opening.

- Insert over the PVC pipe carefully until it fits snugly at the base.

- Paint a square area of Bitumen WB around the pipe.

- Place fleece on wet Bitumen, then immediately cover with another  layer of Bitumen WB until fully sealed.

  • Step 4: First Layer – Floor Area (Wet-On-Wet Method)

- Apply a stripe of Bitumen WB on the floor, slightly wider than your  fleece roll.

- Immediately lay the fleece onto the wet surface.

- Immediately apply another coat of Bitumen WB on top of the  fleece until fully covered.

  • Step 5: Continue Floor Application

- Repeat the wet-on-wet process in stripes.

- Ensure each fleece strip overlaps the previous by 3  inches (about 7.5cm).

- At the doorstep, extend the fleece by at least 1 foot.

- Allow the whole area to dry for 1 day before proceeding  to wall skirting.

 

  • Step 6: Skirting Area Application

- Use the same wet-on-wet method for the wall skirting  (minimum 100mm height).

- Apply Bitumen WB, embed fleece while wet, and cover  with more Bitumen WB.

 

  • Step 7: Final Coat

- After 24 hours of drying, apply a final full coat of Bitumen  WB over the entire floor and skirting area for extra  durability.

💧 Optional Water Ponding Test:

 After full drying (about 2 days, weather dependent), you  may perform a water ponding test to check waterproofing  integrity before tiling.

BM FLEECED®-ON BITUMEN SYSTEM (BATHROOM) - LANGKAH PEMASANGAN
ENG FLEECED®-ON BITUMEN SYSTEM (BATHROOM) - INSTALLATION STEP

© 2023 by Fleeced® On System. All rights reserved.

bottom of page